EXPRESSION OF INTEREST IN DEVELOPING A STRATEGY FOR THE ORGANIC SECTOR UNDER CONTRACT TO MAF
2001/2002
1. IDENTIFICATION
Project Code : (Taken from MAF information sheet on topics)
Programme Title : (Maximum of 3 lines of typed text)
Contracting organisation :
Physical address :
PO Box/Private Bag Number :
Suburb :
City :
Country :
Postcode :
Programme Leader :
Title (Prof/Dr/Mr/Mrs/Ms) :
Phone :
Fax :
Email :
2. PROGRAMME GOAL AND RATIONALE
(State the programme goal [in maximum of three lines] and rationale for the work considering allied work already completed or in progress - maximum of one half page)
3. PROGRAMME OBJECTIVES
(Up to 3, each in the format shown below)
Objective 1
Objective Title : (Not more than five words)
Objective Leader : (Research leader for this objective)
Description : (Outline the aims and outcomes expected from this objective. Maximum of one paragraph.)
Methodology : (Outline the general methodology for this objective. Maximum of 2 pages.)
4. PERSONNEL
(Starting with the Project Leader, list the key personnel involved with the programme and indicate the full time equivalent % of their time proposed for each objective. Include any anticipated new appointments. For each key person, attach a brief CV containing relevant information.
| Objective No. (Days on Project) | ||||
| 1 | 2 | 3 | Total | |
Key personnel
Others
TOTAL (Days work on Project for all personnel)
4.2 Collaboration:
(Identify links with relevant workers/ institutions and indicate how collaboration will contribute to the programme goal. List names of collaborators and areas of expertise).
5. FINANCE
5.1 Sub-contracting:
(Indicate any sub-contracting that has been arranged for this programme, giving the agency, the objective, the proportion of the objective costs sub-contracted, and the total funds sub-contracted by objective.)
| Agency | Objective | % (of objective) | (NZ $000) |
5.2 Breakdown of Funding:
(Indicate clearly if broken to objectives and for totalled)
Personnel:
General Operating expenses:
Cost of premises:
Equipment Depreciation/Rental:
Overheads:
GST:
TOTAL:
5.3 Key Milestones:
3-4 milestones for the complete project (not each objective) and date of expected achievement. These will be used for quarterly reporting and payment schedules and should be related to specific achievements and dates.
5.4 Commencement Date: (Specify when research will commence)
5.5 Completion Date: (Specify if different to 31 May 2002)
Contact for Enquiries
Kay Brown
Sector Performance Policy
MAF Policy
Ministry of Agriculture and Forestry
PO Box 2526
Wellington
NEW ZEALAND
Phone: +64 4 894 0695
Fax: +64 4 4 894 0746
Contact this person

